Pipe Repairs with Blueline Technology

Nuflow Central Queensland can provide easy pipe repair solutions making use of Blueline technology.

Blueline offers a structural repair and rehabilitation solution for a variety of drainage systems including sewerage pipes; stormwater pipes and vertical drain stacks.

Nuflow Central Queensland Nuflow Central Queensland
Nuflow Central Queensland Nuflow Central Queensland

Blueline can be utilised all types of plumbing pipes including;

  • Clay pipes
  • Concrete pipes
  • Metal pipes
  • Iron pipes
  • Steel pips
  • PVC pipes
  • Fiberglas pipes

Blueline restores and maintains water flow and acts as a barrier between water and pipe walls that stops leaks, bridges gaps and spans holes in the pipe. Blueline is a seamless, joint-free pipe repair process that is used to rehabilitate blocked drains and deteriorating sewer and stormwater pipes with multiple bends, elbows, branches and transitions in pipe diameter all from existing access points.

Nuflow are the specialists in Lateral Connection Liners (LCL) for any type of junction. We can reline any type of pipe, diameter or length combination. From 45 or 90 degrees.

What are the benefits?

  • Prevents root intrusion and stops leaks
  • Assists to prevent blocked drains
  • Increases water flow
  • No digging or destruction
  • Offers the structural strength of new pipes
  • Alternative to drain replacement

How does the Blueline system work?

Blueline System | Nuflow Central Queensland

  1. Before any relining takes place, the drains must first be inspected and surveyed. We use a pipe camera to identify and locate the cause of the problem. The drain is then cleared using high pressure water jets; once the blockage is cleared the pipe is then ready for the liner installation.
  2. Our liner is custom made from fabric that is impregnated with specially formulated two part epoxy resin that sets hard, becoming a structural repair, in a matter of hours allowing minimal disruption and inconvenience.
  3. Once the liner is tailor made and prepared, it is inserted in to your drain via any opening in the drain. It is positioned in place with a camera and inflated, forcing the liner to take the shape of the pipe filling voids or cracks and lining over any damaged section. After a curing period, the internal bladder of the liner is removed, completing the process and making the drain ready for use immediately.

Warranty

On completion of all work carried out, you will have a 10 year installation guarantee and a limited manufacturer’s warranty of 50 years.

We are covering the CQ Area including St Lawrence, Yeppoon, Rockhampton, Emerald and Gladstone

Contact us

Nuflow CQ, 6 Ridge Avenue, Lammermoor, Yeppoon QLD 4703

P 0408 433 922